{{ it.name }}
- {{ sg.label }}
{{ sg.state }}
{{ stateBody }}
{{ crumb }}
{{ subtitle }}
Planned, running, tested and approved are different states. A stage opens only when the previous gate has evidence and a named authority; no gate is passed by a score.
| ADR | Decision | State | |
|---|---|---|---|
| {{ a.id }} | {{ a.text }} | {{ a.state }} |
Stack versions in ADR-2 are the architect's proposal; the implementer verifies supported versions at build time. Nothing here pins a dependency.
Grants Management Suite PRD v3 · approved by sponsor 30 Sep · 4 stories, 9 criteria
Grants officer · Finance reviewer · Programme lead (synthetic personas; no real staff)
Frame v4 · 12 screens · last fetched 6 Oct 18:02 WAT
| Story | Acceptance criteria | Design coverage | |
|---|---|---|---|
| {{ st.id }} {{ st.text }} | {{ st.criteria }} | {{ st.coverage }} |
Record application → assign reviewer → review decision (approve / return with reason) → period export. Mobile (390px) and keyboard variants required by GS-4 are unreviewed; the design gate stays open until they are.
| Suite | Actual result | Commit · environment | Evidence / verifier | State | |
|---|---|---|---|---|---|
| {{ t.suite }} | {{ t.result }} | {{ t.commit }} | {{ t.verifier }} | {{ t.state }} |
Security and isolation suite has not run; accessibility has 2 failures; integration not run. The gate opens only when every required suite has a passing, provenance-bound result.
A result without a commit and environment binding is excluded from the gate, however green it looks.
None recorded. An incident needs telemetry or a human report; absence of telemetry is not absence of incidents.
{{ ops.changeAuthority }}. Recovery runbook: not yet written (gate blocker for release). Rehearsal: not run.
{{ ops.cost }} · dependencies: {{ ops.dependencies }}
{{ dlg.kicker }}
{{ dlg.body }}